![]() ![]() ![]() The main cause of the gap, which further engineering analysis determined was a large delamination, was attributed to the scope and sequence of the tendon detensioning. During the concrete removal in creating the opening workers discovered a large gap in the concrete of the containment building wall. In preparing the containment building for making the opening to replace the two OTSG's, tendons in the containment building wall were detensioned. The Crystal River reactor went offline in September 2009 for refueling, OTSG replacement (once through steam generator), and 20% power up-rate outage. It was the third plant built as part of the 4,700-acre (1,900 ha) Crystal River Energy Complex (CREC) which contains a single nuclear power plant, while sharing the site with four operational fossil fuel power plants. The power plant was completed and licensed to operate in December 1976, and operated safely for 33 years until shutdown in September 2009. The facility is currently being decommissioned and is transitioning to a SAFSTOR condition. The Crystal River Nuclear Plant also called the Crystal River 3 Nuclear Power Plant, or simply CR-3, is a closed nuclear power plant located in Crystal River, Florida.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |